PLANNING OPERATIONS

  • Timetable Optimization
  • Reduced Service Planning
  • Emergency Scenario Planning
  • Vehicle Rostering
  • ETCS Consulting

PLANNING THE FUTURE

  • Feasibility Studies
  • Operations Plan
  • Future Timetable Concept
  • Demand Forecast Impact Analysis
  • Timetable Concept Analysis

CONSULTING & ENGINEERING

  • Interface Design
  • Signalling Commissioning
  • ETCS Consulting
  • Signalling Design
  • System Engineering
  • System Integration

SIMULATION & PLANNING

  • Headway & Runtime Simulation
  • Conflict Detection
  • Timetable Simulation
  • Capacity Verification
  • ETCS Timetable Impact Analysis
  • Line Block Time Optimization

TECHNICAL SUPPORT

  • OpenTrack Software Setup, Tech Support & Training
    SMA Viriato Software

PRODUCTS

  • OpenTrack Software
  • Viriato Software

Rail Systems Engineering